Realtronik
Home/Projects / ITRS autonomous power system
← Back
Case study · Railway

ITRS autonomous power system

We gave a freight wagon its own power grid. Energy, automation and connectivity are built into the wagon itself — no locomotive supply, no charging infrastructure. Developed with Schaeffler and proven on a real freight route.

ITRS autonomous power system
>100,000km distance tested
6,166km field tested
849automated actions
0critical faults

01 — The challenge

Freight wagons run without any electrical supply. Sensors, automation and telematics need power — without depending on the locomotive or on charging infrastructure.

02 — The solution

A complete onboard system, developed in a technology partnership with Schaeffler.

  • Schaeffler axlebox generator — self-charging while the wagon runs
  • Battery system for autonomous power
  • Real Control — wagon automation with custom HMI
  • RealConnect Bridge — LTE/5G onboard gateway
  • RealConnect cloud platform — live data from the wagon, anywhere

03 — The impact

  • Laboratory test on DIN EN 12082 test rig, 17 Mar – 27 Apr 2026
  • Field test Borlänge – Oxelösund, Sweden, at −24 to +26 °C
  • EC Type Examination by SIQ Ljubljana, NoBo 1304, module SB
  • Compliant with EN 50155, EN 12080 and EN 50121-3-2

Read next

Have a project in mind?

Start a project →